Company News

Contact Us

Tel:0536 - 6438321

        0536 - 6121970

Fax:0536 - 6121970
Mr Xu:13589178002       
E-mail
 georgegu@chuangxinhuayi.net
Company Address:
the Zhucheng Long Street Industrial Park.
    点击这里给我发消息    点击这里给我发消息
Sewage treatment pro

Sewage treatment process and technology

      The sewage treatment process is mainly used in hotels, restaurants, schools, offices and factory sewage purification, sewage treated to achieve the required emission standards.
Process characteristics
1, using a combination of hydrolytic acidification and biological contact oxidation method to effectively improve the treatment effect, the treated water to the national emission standards.
2, the sludge produced less reflux digestion of the sludge generated by the various stages of the final sludge is collected regularly.
3, the process can be organic combination, can be located under the surface or ground room, also can take the Underground. When buried in the ground at the top of the device can be used as car parks or green lawn, in harmony with the surrounding environment.
4, the high degree of automation equipment, fans, pumps and other equipment automation system run to reduce operator workload, the device effective measures to reduce noise and odor, has no effect on the surrounding environment.
5, water reuse after advanced treatment.


                                                                http://www.chuangxinhuayi.net

Name:Underground sewage treatment flow chart

Product Description: 生活污水处理工艺主要用于宾馆、饭店、学校、机关、和工厂的生活污水净化,使处理后的污水达到规定的排放标准。

Details
      The sewage treatment process is mainly used in hotels, restaurants, schools, offices and factory sewage purification, sewage treated to achieve the required emission standards.
Process characteristics
1, using a combination of hydrolytic acidification and biological contact oxidation method to effectively improve the treatment effect, the treated water to the national emission standards.
2, the sludge produced less reflux digestion of the sludge generated by the various stages of the final sludge is collected regularly.
3, the process can be organic combination, can be located under the surface or ground room, also can take the Underground. When buried in the ground at the top of the device can be used as car parks or green lawn, in harmony with the surrounding environment.
4, the high degree of automation equipment, fans, pumps and other equipment automation system run to reduce operator workload, the device effective measures to reduce noise and odor, has no effect on the surrounding environment.
5, water reuse after advanced treatment.


                                                                http://www.chuangxinhuayi.net

  Copyright © 2012 the Zhucheng Innovation China an Environmental Protection Technology Co., Ltd.  
Ministry of Industry and the Ministry of Information website for the record number: Lu ICP 12018211
Address: Shandong Zhucheng Long Street Industrial Park    
 Contact:0536 – 6438321  0536 - 6121970   Fax: 0536 – 6121970     Mr. Xu:13589178002     

                   National free telephone:400-0536-623

      Technical Supporthengtaihulian



>