Company News

Contact Us

Tel:0536 - 6438321

        0536 - 6121970

Fax:0536 - 6121970
Mr Xu:13589178002       
E-mail
 georgegu@chuangxinhuayi.net
Company Address:
the Zhucheng Long Street Industrial Park.
    点击这里给我发消息    点击这里给我发消息
Integrated sewage tr

Integrated sewage treatment equipment

First, an overview
With the economic growth of the population, the pollution of nature become more and more human attention, and run on the basis of summing up the sewage installations, combined with my own scientific research and labor practices, to design a set of organic wastewater treatment plant, the equipment used in the late nineties at home and abroad advanced technology and manufacturing technology, glass, steel and stainless steel just as the main material of the sewage treatment plant, its main purpose is to make life sewage and industrial wastewater user discharge or reuse the device to achieve The purpose of the request.
The equipment is mainly used in the residential area (including villas), manufacturers of small luxury hotels, hospitals, integrated office, printing and dyeing, chemical plants, wastewater treatment units. Of the device in water quality to meet the national emission standards for sewage comprehensive, complete set of equipment can be buried underground, so called "Buried Sewage Treatment Plants".
Second, the characteristics
, ZWF1 Sewage Tegretol complete sets of equipment, buried below the surface, the equipment above the surface can afforestation, no housing, heating, warm treated water 5t / h following equipment can be fiberglass or A3 steel corrosion production.
2, two biological contact oxidation process are used diffused aeration activated sludge to the small size, adaptability to water quality, water quality and stability, does not produce sludge Peng Zhang.
3, the reaction cell using a biological trigger oxidation, only three months (90 days), more than row once mud truck aspiration or dehydration as cake Sinotrans.
4, the entire processing equipment generally does not require special management, simply timely equipment maintenance and upkeep.
5, a small amount of changes in water quality has a strong adaptability.
6, no pressurized containers. Air compressor and circulation pumps and other equipment, thereby greatly reducing the investment costs.
7, the low power requirements, maintenance and manual ZWF is an aerobic process, the sludge generated by the smell problem has been resolved.
Third, buried sewage treatment plant application
, Hotels, restaurants, nursing homes, hospitals.
2, residential areas, villages and towns.
3, stations, airports, port terminals, ships.
4, factories, mines, military units, tourist spots, scenic areas.
5, similar to the sewage to industrial wastewater.
Fourth, the process flow diagram
The primary sedimentation tank in the sewage → → → A-level biological pool (aerator) adjust the pool
                                        

Disinfection of emission ← ← pool secondary sedimentation tank ← B-class bio-pool (aerator)
Five, the specification model
Project Type
ZWF-0.5
ZWF-1
ZWF-3
ZWF-5
ZWF-10
ZWF-15
ZWF-20
Standard handling capacity
0.5
1
3
5
10
15
20
设计进水BOD(mg/L)
                 400
设计进水COD(mg/L)
                 800
设计进水SS(mg/L)
                 800
设计进水NH3-N(mg/L)
                 500
设计出水 (mg/L)
BOD﹤60COD﹤100SS﹤30NH3-N﹤15
 
Six, the structure:
The overall carbon steel anti-corrosion of the equipment, but also by my factory box drawings, user-built concrete structure, guided by my factory technical personnel on-site installation, can provide the machine, can I plant components installed in the user site.
G. Service
1, the user of pending wastewater feasibility report to determine the shape of equipment.
2, such as the device processing sewage reuse, a set of coagulation and filtration equipment can be added to the device. The device can be buried underground, the implementation of automatic continuous operation. Treated effluent can be used for toilet flushing water, irrigation water, the body non-contact water, the water quality of the water quality requirements in the country, namely COD £ 100, of BDO £ 60mg / L, the SS £ 30mg / L.
3, is responsible for equipment installation, commissioning and maintenance staff induction training, and provide maintenance services.
4, this manual processing specifications 0.5-5m3 / h for the conventional specifications for large water users, the Company can be designed and equipment manufacturing.
Details
First, an overview
With the economic growth of the population, the pollution of nature become more and more human attention, and run on the basis of summing up the sewage installations, combined with my own scientific research and labor practices, to design a set of organic wastewater treatment plant, the equipment used in the late nineties at home and abroad advanced technology and manufacturing technology, glass, steel and stainless steel just as the main material of the sewage treatment plant, its main purpose is to make life sewage and industrial wastewater user discharge or reuse the device to achieve The purpose of the request.
The equipment is mainly used in the residential area (including villas), manufacturers of small luxury hotels, hospitals, integrated office, printing and dyeing, chemical plants, wastewater treatment units. Of the device in water quality to meet the national emission standards for sewage comprehensive, complete set of equipment can be buried underground, so called "Buried Sewage Treatment Plants".
Second, the characteristics
, ZWF1 Sewage Tegretol complete sets of equipment, buried below the surface, the equipment above the surface can afforestation, no housing, heating, warm treated water 5t / h following equipment can be fiberglass or A3 steel corrosion production.
2, two biological contact oxidation process are used diffused aeration activated sludge to the small size, adaptability to water quality, water quality and stability, does not produce sludge Peng Zhang.
3, the reaction cell using a biological trigger oxidation, only three months (90 days), more than row once mud truck aspiration or dehydration as cake Sinotrans.
4, the entire processing equipment generally does not require special management, simply timely equipment maintenance and upkeep.
5, a small amount of changes in water quality has a strong adaptability.
6, no pressurized containers. Air compressor and circulation pumps and other equipment, thereby greatly reducing the investment costs.
7, the low power requirements, maintenance and manual ZWF is an aerobic process, the sludge generated by the smell problem has been resolved.
Third, buried sewage treatment plant application
, Hotels, restaurants, nursing homes, hospitals.
2, residential areas, villages and towns.
3, stations, airports, port terminals, ships.
4, factories, mines, military units, tourist spots, scenic areas.
5, similar to the sewage to industrial wastewater.
Fourth, the process flow diagram
The primary sedimentation tank in the sewage → → → A-level biological pool (aerator) adjust the pool
                                        

Disinfection of emission ← ← pool secondary sedimentation tank ← B-class bio-pool (aerator)
Five, the specification model
Project Type
ZWF-0.5
ZWF-1
ZWF-3
ZWF-5
ZWF-10
ZWF-15
ZWF-20
Standard handling capacity
0.5
1
3
5
10
15
20
设计进水BOD(mg/L)
                 400
设计进水COD(mg/L)
                 800
设计进水SS(mg/L)
                 800
设计进水NH3-N(mg/L)
                 500
设计出水 (mg/L)
BOD﹤60COD﹤100SS﹤30NH3-N﹤15
 
Six, the structure:
The overall carbon steel anti-corrosion of the equipment, but also by my factory box drawings, user-built concrete structure, guided by my factory technical personnel on-site installation, can provide the machine, can I plant components installed in the user site.
G. Service
1, the user of pending wastewater feasibility report to determine the shape of equipment.
2, such as the device processing sewage reuse, a set of coagulation and filtration equipment can be added to the device. The device can be buried underground, the implementation of automatic continuous operation. Treated effluent can be used for toilet flushing water, irrigation water, the body non-contact water, the water quality of the water quality requirements in the country, namely COD £ 100, of BDO £ 60mg / L, the SS £ 30mg / L.
3, is responsible for equipment installation, commissioning and maintenance staff induction training, and provide maintenance services.
4, this manual processing specifications 0.5-5m3 / h for the conventional specifications for large water users, the Company can be designed and equipment manufacturing.

  Copyright © 2012 the Zhucheng Innovation China an Environmental Protection Technology Co., Ltd.  
Ministry of Industry and the Ministry of Information website for the record number: Lu ICP 12018211
Address: Shandong Zhucheng Long Street Industrial Park    
 Contact:0536 – 6438321  0536 - 6121970   Fax: 0536 – 6121970     Mr. Xu:13589178002     

                   National free telephone:400-0536-623

      Technical Supporthengtaihulian



>