Cooking to increase the amount of ball, shorten the cooking time, reduce the amount of chemicals. (About traditional cooking dosage of 1/4), or soaked in hot water, do not need to steam cooking, ground wire installed, you can also use raw materials directly and grinding mechanical pulping, the raw material directly to ground into a filamentous through screening refining, production of yellow laminating, corrugated, cardboard, etc.. Achieve pollution-free paper, and reduce environmental pollution and is conducive to the beating of the lower segment processes, simplifying the pulping process, the clean pulp. With high concentrations of the refiner, efficient grinding mechanism into different plasma standard of this chemical paste, full bleached chemical pulp, semi-chemical mechanical pulp, cold invasion of France high German rate of pulp, mechanical pulp, CMP, of CTMP and APMP chemical machinery pulp.
Second, the technical parameters
型号
|
螺旋直径
|
磨浆浓度
|
生产能力
|
配用电机
|
ZCMS-250
|
ф 250mm
|
30-90%
|
10-20t/d
|
90-132kw-6
|
ZCMS-350
|
ф 350mm
|
30-90%
|
20-30t/d
|
160-220kw-6
|
The double helix and grinding in silk machine part of the feed, pulp and part of the bearing part reducer part, distribution, transmission parts, motor six major components. Reducer variable speed motor, through the allocation of the transmission part of the history of raw materials through the spiral, forced into the pulp part of the pulping part of the raw material processed into a fine velvet-like fibers discharged from the discharge opening.
Fourth, the installation instructions for use
A double helix and grinding the debug sub-wire machine factory has passed the empty material inspection after packing factory.
2, install the second alignment, secondary grouting the history of construction methods to achieve the installation precision requirements.
Slave must be corrected coupling, base deviation of not greater than ± 0.5mm.
4, the boot should be checked before each lubrication point is reliable lubrication, as required, add oil.
, Boot, shutdown sequence and Notes
Power on:
1, first start checking components bolt is solid, whether the coupling is.
2, the various parts of filling a good lubricant.
3, feed mouth with or without foreign body.
4, start the main motor.
5, the first start-up, empty running two minutes to check any abnormal sound.
Feed evenly into the material do not (pay attention to the feed motor current exceeds the rated current value).
7, to ensure smooth discharge opening.
Refining experience: high raw material concentration, water content of small deals with a small fiber, that is fine pulp, then the yield is low. Low concentration of raw materials, the moisture content of large thick handle fiber, which is the slurry of crude, the high yield.
Downtime
1, the first stop feeding.
2 to be the raw materials are discharged host injected into the wash with water machine, slurry, and then stop the motor, so as to avoid the next time you start the host when the difficulties, the current load is too high.
Note:
1, is strictly prohibited stones, iron into the machine, if found should be immediately shut down, cleaned up before boot.
2, uniform feeding, otherwise prone to clogging, the motor not to exceed the rated current.
6, the bearings wearing parts schedule
名称
|
规格及型号
|
数量
|
材料
|
配套部分
|
推力滚子轴承
|
7517
|
6
|
/
|
分配传动部分
|
双列向心滚子轴承
|
53522
|
2
|
/
|
主机出料口部分
|
单列向心滚子轴承
|
318
|
2
|
/
|
主轴承座部分
|
推力滚子轴承
|
7619
|
2
|
/
|
主轴承座部分
|
刀棍一
|
DG-1
|
2
|
特钢
|
主机
|
刀棍二
|
DG-2
|
2
|
特钢
|
主机
|
刀棍三
|
DF-3
|
2
|
特钢
|
主机
|
刀棍四
|
DG-4
|
2
|
特钢
|
主机
|
上衬板
|
CB-1
|
1
|
合金铸铁
|
主机
|
下衬板
|
CB-2
|
1
|
合金铸铁
|
主机
|
齿轮
|
CB-1
|
3
|
45#
|
传动分配部分
|